Testing Complete
We have spent the past couple weeks doing testing and making everything else come together. Now that testing is completed we are doing...


Ready to Test
This week we were able to accomplish a lot and get much further within our building process. Today we assembled our actual filter...
Week 12: Preperation
Really no major updates this week but we have been waiting on parts and basically updated our paper and presentation for our final pitch.


Week 11: All Materials
This week has been our most productive to date. We have collected all of our necessary materials with the exception of a valve that will...
Week 10: All Flowing Together
This week we purchased most of our filter components(sand, activated carbon, and 25 micron mesh) as well as attempted to pre-assemble our...


Week 9: Final Design
This week we narrowed down our final design to a partial sediment and activated carbon filter. We realized that the filter would not...


Week 8: Culminating and Cultivating
This week a lot has been done by our group to make changes to and benefit our project. We have worked through our many different ideas...


Week 7: Liquidation
This week was integral in the future of our project. Some major group decisions were made that included down sizing our group. On top of...
Week 6: Finalizing the Design
This week we have spent a lot of time deciding upon a final design concept for us to test and research. We have decided on working with a...


Week #5: Prototyping
Throughout this week our group began the prototyping procedure. This is a necessary step in any product development as it helps to give...